I have used information gathered from planning applications, photographs and site visits to draw a set of plans and an elevation of my proposed site. I found this process useful and researching the site was very interesting. There have been several planning applications relating to the gap between the corner of Brick Lane and 24-26 Fournier Street, an application to turn 24-26 into offices and a proposal to demolish number 28 and build a modern townhouse in its place. I have tried to be as accurate as possible but somethings were impossible to measure or get drawings of so I have had to use photographs to copy a few details.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment